As Assistant Project Manager for this Catholic church in Calais, Maine, I was tasked with translating schematic level design drawings into a 3-d computer model as well as generating all architectural construction documents. While my involvement in the concept design was negligible, I was responsible for most of the detailing throughout the building, as well as all submittal review and a large part of the construction administration. Project is expected to be completed in early 2008.